Strip Out of Existing Bathroom✅
Removal of Existing Vinyl Floor✅
Removal of Existing Wooden Window Sill✅
Removal of Existing Radiator✅
1st & 2nd Fix New Plumbing✅
1st & 2nd Fix New Downlights & Switch✅
New Thermostatic Mixer Shower✅
Vanity Unit Installation ✅
Storage Unit Installation✅
Shower Tray & Enclosure Installation✅
White Bevelled Edg
This is one of our recently completed (nearly) toilet refurbishments which we managed to squeeze in prior to the Christmas break so it was functional for the client. A return visit is required to complete a few small cosmetic items and complete the window sill tiling once the window has been replaced.
Plasterboard, Tape & Joint
Bond & Seal Floor
Self Levelling of Floor
Tile & Grout to W